Electromechanical overcurrent relays still protect a lot of switchgear in DC, Maryland and Virginia. They sense current from CTs and trip the breaker after a delay that gets shorter as fault current rises, following an inverse time curve. Their springs, discs and contacts wear and drift over time, so periodic testing and calibration confirm that the relay still trips when and how the coordination study says it should. The video below shows one relay tripping at 200%, 400% and 600% of its pickup setting.
What an electromechanical overcurrent relay does
The relay watches secondary current from the current transformers (CTs). When that current passes the pickup (tap) setting, an induction disc starts to turn.
The time-overcurrent element (ANSI/IEEE device 51) closes its contacts after a delay set by the time dial. The instantaneous element (device 50) trips with no intentional delay above a higher setpoint. The trip contacts energize the breaker trip coil directly or through an 86 lockout relay.
Settings come from the CT ratio, the ampacity of the protected bus, cable or load, and the facility’s coordination study.
Reading the curve: why bigger faults trip faster
Time is on the y-axis and current, in multiples of pickup, is on the x-axis. On the very inverse (VI) curve shown, at time dial 4, a fault at about 200% of pickup trips in roughly 6 seconds, and at about 600% in roughly 0.85 seconds, per the curve shown.
Curve families include inverse, very inverse and extremely inverse. Modern digital relays reproduce them using standard equations such as IEEE Std C37.112-2018.
Why coordination matters
The goal is to clear a fault fast enough to limit damage and arc-flash exposure, and to trip only the device closest to the fault so the rest of the facility stays energized. A relay that has drifted slow, or contacts that don’t make, can let an upstream breaker trip instead and take out a much larger area. Curves and settings should match the current coordination and arc-flash study.
How we test electromechanical relays (NETA)
Typical maintenance testing under ANSI/NETA MTS includes:
- Visual and mechanical inspection: disc travel, spring, magnets, and contact cleanliness and condition
- Pickup test of the time-overcurrent (51) and instantaneous (50) elements
- Timing tests at several multiples of pickup (for example 2x, 4x and 6x, as in the video), compared with the manufacturer’s curve
- Calibration when the results fall outside the manufacturer’s published tolerance or the limits in ANSI/NETA MTS, then a trip test through the breaker or lockout to prove the whole circuit
- As-found and as-left results recorded in the test report
See why dirty contacts can stop a trip → Electromechanical Relay – Contact Cleaning
Electromechanical vs. digital (microprocessor) relays
Many sites are replacing electromechanical relays with microprocessor relays such as GE Multilin, which add event records, multiple curves and self-monitoring. Electromechanical relays are still common and reliable when they’re maintained. If you replace them, the new relay needs acceptance testing and settings verification before it goes into service.
FAQ
How often should protective relays be tested?
It depends on how critical the equipment is and on its condition. ANSI/NETA MTS Appendix B gives recommended maintenance frequencies as a guide, and many facilities land on a 1–3 year cycle after applying those factors.
What are pickup and time dial?
Pickup is the current level where the relay starts timing. The time dial shifts the curve up or down to set how long it waits.
What’s the difference between a 50 and a 51 element?
50 is instantaneous overcurrent and 51 is time-delayed (inverse time) overcurrent.
Can a relay pass a pickup test and still fail to trip?
Yes. Dirty or pitted contacts, an open trip circuit or a bad lockout can all stop a trip. That’s why we test through to the breaker.
Do relays need testing after a new install?
Yes. Acceptance testing confirms wiring, settings and operation before energization.
Need protective relays tested, calibrated or replaced in DC, Maryland or Virginia? Electrical Test Tech is a NETA-accredited independent testing company in Lanham, MD. Call (877) 388-0911 or request a quote online.
Related posts: Relay Contact Cleaning · GE Multilin Protective Relaying · Anti-Pump Relay · Modified Primary Injection Testing · The Importance of Acceptance Testing · Why NETA Standards Matter
2 comments on “Electromechanical Overcurrent Relays: How They Work, Curves & Why Testing Matters”
Very useful article sir, but there are few others ways to test a relay with a multimeter here is an article that can also help your users.
Thanks for uploading great stuff.